Mokha Corner standard operating procedures
These procedures are for all staff at Mokha Corner in Jeddah. Follow the steps in order, use your own 4-digit PIN, and ask the shift lead when you are unsure.
1. Opening checklist
- Start the morning shift at 06:00.
- Turn on the lights.
- Set the AC to 21 °C.
- Put the music on low.
- Unlock the terrace.
- Bring the La Marzocco Linea PB out of standby.
- Check that the boiler is at 1.2-1.4 bar.
- Turn on the grinders, including the EK43.
- Set the pastry oven to 180 °C.
- Check the ice machine.
- Wash your hands at the dedicated blue-tap sink for 20 seconds with soap and warm water.
- Dry your hands with paper.
- Put on your clean uniform, brown apron and name badge.
- Record all fridge temperatures on the sheet.
- Move stock to the back fridge and tell the shift lead if any temperature is out of range.
- Check milk stock and dates.
- Discard milk past its day-dot.
- Make the saffron milk base using the recipe in section 4.
- Label the saffron base with the date it was made.
- Put the croissants in the oven at 05:45.
- Put the baked pastries in the display with tongs and labels.
- Dial in espresso with at least three shots until 18 g gives 36-38 g out in 26-30 seconds.
- Taste the espresso before service.
- Brew the batch filter.
- Make the qahwa thermos.
- Fill the syrups.
- Stock cups, lids, sleeves, straws, napkins and dates.
- Put a 500 SAR float in the till.
- Count the float.
- Sign the opening sheet.
- Wipe the bar with the green cloth.
- Put the blue, green and red cloths in their fresh sanitiser buckets.
- Leave the floor dry.
- Unlock the front door at 06:30 exactly.
2. Customer order and payment flow
- Make eye contact within 5 seconds of the customer reaching the till.
- Greet the customer with "السلام عليكم، حياك الله".
- Continue in the language the customer uses.
- Ask for the order.
- Ask "Double or single?" when the order allows it.
- Ask "dates with the qahwa?" when the customer orders qahwa.
- Ask about allergies when needed.
- Read the allergen card in the black folder by the till if the customer asks about an allergy.
- Call the shift lead if the allergen card does not answer the question.
- Log in to Foodics with your own 4-digit PIN.
- Enter the item in the order of size, then milk, then extras.
- Add +3 SAR for an upgrade.
- Add +3 SAR for oat milk.
- Add +5 SAR for an extra shot.
- Ask "here or takeaway".
- Repeat the complete order before taking payment.
- Tell the customer before payment if the wait will exceed 10 minutes.
- Take payment by mada card, Apple Pay or cash.
- Open the cash drawer only for a cash sale.
- Count cash change back out loud.
- Give the customer the receipt.
- Call the ticket to the bar.
- Say the drink name when serving it, for example, "Spanish latte for Sara".
- Tell a V60 customer that it takes 4 minutes before starting the brew.
- Say the V60 origin and read the note card when serving it.
3. Delivery orders and refunds
- Watch the HungerStation and Jahez tablets.
- Accept each delivery order within 2 minutes.
- Print the order.
- Prepare the items on the printed ticket.
- Put hot items in one bag.
- Put cold items in a separate bag.
- Double-lid the cups.
- Add a napkin.
- Add a stirrer.
- Put the sticker on the bag.
- Check the order against the printed ticket.
- Place the genuinely bagged order on the delivery shelf.
- Mark the delivery order ready only after it is on the shelf.
- Tell a rushing delivery driver, "تحت أمرك", and ask the driver to wait at the marked spot.
- Serve the customer at the till before the delivery driver.
- Void an order before payment when needed.
- Ask the shift lead to process a refund after payment.
- Check the original receipt before a refund.
- Use the shift-lead PIN for the refund.
- Escalate refunds over 30 SAR to Noura on evenings or to Faisal.
4. Spanish latte procedure
- Use a 12 oz cup.
- Put 30 ml of condensed milk in the cup first.
- Measure the condensed milk as two pumps from the black pump.
- Confirm that each pump is 15 ml.
- Dose 18 g of coffee.
- Pull a double shot.
- Stop the shot at 36-38 g out.
- Keep the shot time between 26-30 seconds.
- Pull the shot directly onto the condensed milk.
- Stir the shot and condensed milk three full turns with the long spoon.
- Measure 180 ml of full-fat milk.
- Steam the milk to 60-62 °C.
- Make the milk glossy with no big bubbles.
- Add a small dot of foam.
- Do not add latte art for takeaway.
- Serve the drink under 4 minutes at normal times.
- Remake a Spanish latte that is too sweet with one pump less at no charge.
5. Iced Spanish latte and saffron latte procedures
- For an iced Spanish latte, put the condensed milk in the cup.
- Pull the shot into the cup.
- Stir the condensed milk and shot together.
- Fill the cup with ice to the top.
- Pour 150 ml of cold milk over the ice.
- Do not stir after adding the milk.
- For the saffron base, measure 1 L of full-fat milk.
- Add 0.3 g of saffron threads.
- Measure the saffron as one small pinch with the little spoon in the saffron tin.
- Add 15 g of sugar.
- Warm the base to 65 °C.
- Steep the base for 20 minutes.
- Strain the base.
- Write the date it was made on the label.
- Keep the base in the small fridge.
- Discard the base after 24 hours.
- For a saffron latte, pull a double shot.
- Measure 200 ml of saffron base.
- Steam the saffron base to 60-62 °C.
- Pour the base over the shot.
- Finish the drink with exactly three saffron threads.
- Tell the customer it is finished for today if the saffron base has run out.
- Never substitute turmeric or saffron syrup.
6. V60 procedure
- Tell the customer the V60 takes 4 minutes.
- Check the current single origin and note card before brewing.
- Set the EK43 to 6.5.
- Dose 15 g of coffee.
- Check that the grind looks like table salt.
- Heat 250 g of water to 92-94 °C.
- Place the paper filter in the V60.
- Rinse the filter with hot water.
- Discard the rinse water.
- Use the rinse water to warm the server.
- Add the coffee.
- Pour 45 g of water for the bloom.
- Start the timer.
- Swirl gently.
- Wait 40 seconds.
- Pour slowly in circles to 150 g.
- Keep the pour away from the paper.
- Make the third pour to 250 g at 1:15.
- Check that drawdown finishes between 2:45 and 3:15.
- Grind finer if the brew is faster than 2:30.
- Grind coarser if the brew is slower than 3:30.
- Serve the V60 in the glass carafe.
- Add a small tasting cup.
- Say the coffee origin.
- Read the note card.
7. Qahwa and pastry procedure
- Use the 3 L thermos for qahwa.
- Add light-roast qahwa powder.
- Add cardamom.
- Add a few saffron threads.
- Add no sugar.
- Make qahwa twice a day.
- Date-label the thermos.
- Discard the qahwa after 6 hours.
- Serve it hot from the dallah.
- Serve finjan cups with dates.
- Pour with the right hand.
- Fill each finjan one-third full.
- Keep refilling while the guest holds out the cup.
- Take the cup when the guest shakes it side to side.
- Do not ask again after the guest shakes the cup.
- Preheat the pastry oven to 180 °C.
- Bake croissants for 14 minutes.
- Bake za'atar croissants for 12 minutes.
- Bake pastries at 05:45 and again at 15:00.
- Use the marked nut board for anything containing pistachio or almond.
- Do not use the sandwich board or bar for nut items.
8. Espresso, equipment and cleaning
- Keep the La Marzocco Linea PB at 1.2-1.4 bar boiler pressure.
- Keep the brew temperature at 93 °C.
- Use the Mahlkönig E65S for espresso.
- Use the Mazzer for decaf.
- Use the EK43 for filter.
- Use the espresso recipe of 18 g in, 36-38 g out, in 26-30 seconds.
- Dial in espresso at open with at least three shots.
- Re-dial after the 15:00 bean change.
- Re-dial when weather or humidity changes.
- Re-dial on the new bag from Nawa Roasters on Tuesday.
- Grind finer one notch at a time if a shot runs under 26 seconds.
- Grind coarser one notch at a time if a shot runs over 30 seconds.
- Re-pull a shot before deciding on the setting.
- Brush the left group head when you start the shift.
- Brush the left group head again after the 15:00 bean change.
- Brush up into the shower screen.
- Flush the group head.
- Wipe the gasket.
- Tamp dead level.
- Stop using the left group and tell Ammar if it still drips after brushing and tamping.
- Purge the steam wand before every drink.
- Purge the steam wand after every drink.
- Wipe the steam wand with the blue cloth.
- Backflush both groups with Cafiza for 5 cycles of 10 seconds per group at close.
- Run 3 rinse cycles.
- Take apart the portafilters and baskets.
- Clean the portafilters and baskets in Cafiza solution.
- Rinse them well.
- Soak and wipe the steam wands at close.
- Empty and brush the grinder hoppers at close.
- Keep water away from the burrs.
- Use the blue cloth for milk and the steam wand.
- Use the green cloth for surfaces.
- Use the red cloth for toilets and bins.
- Keep each cloth in its own sanitiser bucket.
- Clean the ice machine every Sunday.
- Change the BWT water filter cartridge every 6 months.
- Write the filter change date on the sticker on its side.
9. Food safety and stock control
- Keep fridges at 0-4 °C.
- Keep the freezer at −18 °C or below.
- Keep hot-held food above 63 °C.
- Record actual temperatures at 07:00, 14:00 and 21:00.
- Write the readings on the sheet by the fridge.
- Move stock to the back fridge when a temperature is out of range.
- Tell the shift lead about the out-of-range temperature.
- Write the problem on the sheet.
- Put a day-dot with the date and time on every opened milk carton.
- Use opened milk within 24 hours.
- Discard milk left out of the fridge for more than 30 minutes.
- Never re-steam steamed milk.
- Never pour steamed milk back into the carton.
- Brew cold brew for 18 hours.
- Keep cold brew in the fridge for 5 days with the brew date on the label.
- Discard batch brew after 1 hour.
- Label decanted syrups for 30 days.
- Label cut fruit for 24 hours.
- Label sandwich fillings for 48 hours.
- Rotate stock using FIFO, with the oldest stock at the front.
- Store chemicals below and away from food.
- Keep chemicals in the marked cupboard.
- Never put chemicals in an unlabelled bottle, cup or water bottle.
- Wash your hands before putting on gloves.
- Use gloves only for ready-to-eat food.
- Change gloves between tasks.
- Do not wear gloves on the coffee bar.
- Prepare nut items only on the marked nut board.
- Tell the shift lead immediately about a food-safety concern, illness, pest sighting or inspector.
10. Handover checklist
- Keep both shifts on the floor during the overlap from 14:45 to 15:15.
- Complete the handover together at the bar.
- Run the X-report from the till first.
- Count the cash with the outgoing lead present.
- Confirm the 500 SAR float remains in the drawer.
- Put anything above the 500 SAR float in the safe with a drop slip.
- Report any till discrepancy to Noura in person immediately.
- Walk the bar with the incoming shift lead.
- Check the milk levels.
- Check how much saffron base remains.
- State when the saffron base was made.
- Check cups and lids.
- Check what is low.
- Check what is broken.
- Re-dial the grinder for the rested beans.
- Report the grinder setting.
- Report the bean rest change.
- Report weather or humidity changes.
- Report machine faults, printer problems, slow steam wand tips and ice machine problems.
- Confirm the fridge records, including the 07:00 and 14:00 rows.
- Confirm the evening shift will take the 21:00 fridge reading.
- Identify who is responsible for the 15:00 pastry bake.
- Report stock shortages to Faisal before 14:00 where possible.
- Report open tickets.
- Report waiting customers.
- Report promised remakes.
- Report anything customers were told would be ready.
- Tell the incoming lead every problem face to face.
- Do not leave a customer promise or problem on a note.
11. Closing checklist and common faults
- Start closing at 23:30.
- Stop the delivery tablets at 23:40.
- Call last orders at 23:45.
- Wrap, label and date all food.
- Discard all pastries because day-old pastries are never sold.
- Discard milk past its day-dot.
- Record the fridge temperature.
- Empty and wash the batch brew equipment.
- Empty and wash the qahwa thermos.
- Drain the ice bin on Sundays.
- Top up and lid the ice bin on other nights.
- Wipe the bar top, tables, chairs, high chairs and menu board.
- Sweep and mop the floor.
- Put out the yellow wet-floor sign until the floor is dry.
- Take the bins out.
- Tie the bin bags.
- Hose the bin area.
- Lock the back door immediately afterwards.
- Run the Z-report.
- Count the cash twice.
- Write the drop slip.
- Put the money in the safe.
- Leave the 500 SAR float in the till.
- Stack and chain the terrace furniture.
- Set the AC to 26 °C.
- Turn the music off.
- Turn off the lights except the security light.
- Put the espresso machine on standby.
- Set the alarm.
- Lock the front door.
- Message the shift group that you are out.
- Clear the chute and check the basket if a shot is weak, watery and has no pressure.
- Tell Ammar if the left group still drips after brushing and level tamping.
- Take off the steam wand tip and soak it in Cafiza if the wand has no power.
- Poke the tip holes clear.
- Hold the printer power button for 5 seconds if the POS iPad will not print.
- Reconnect the printer after it comes back online.
- Tell the shift lead about any fault that remains.